Difficulty
Rating: |
| Double-Storey-Synchronised-Bridge = begins with two people performing bridges on a pair of elevated surfaces. A third person then climbs up onto the legs of the "bridgers". To complete the move the third person then places their feet on the heads of the bridgers. |